
Decking · Basingstoke, Hampshire
Decking in Basingstoke.
Considered decking for homes across RG21 · RG22 · RG23 · RG24. We're locally based, work to one programme, and stay on site until the job's properly finished.
RG21 · RG22 · RG23 · RG24
Workshop in GU15 - close to Basingstoke
Same team on site every day
10+ years across Surrey, Berkshire, Hampshire
Typical book-in is four to six weeks; build one to three weeks on site.
What we mean by decking
The bit beneath the surface.
Decking lives or dies on the sub-frame. Most failed decks didn't fail on the surface - they failed on joist spacings, bearer support and ventilation that were quietly cut to save a day.
Sub-frames built to spec
Joists at the right centres for the board, bearers supported off independent posts where the ground demands it, full ventilation beneath every panel.
Material chosen for use
Hardwood for warmth and grain, composite for low maintenance and stability - each with trade-offs we'll explain rather than gloss over.
Detailed properly
Hidden fixings where the deck will be looked at; recessed LED runs laid in at sub-frame stage; integrated planters and step nosings finished cleanly.
Why this works in Basingstoke
Locally tuned, not location-swapped.
Basingstoke decking projects share a pattern. The houses are well-loved, the kitchens have usually been extended, and the garden is the part that's been waiting its turn.
Newer Basingstoke estate gardens are often smaller and squarer than they look - we plan layouts that don't waste a single useful metre.
Recent decking
A few from in and around Basingstoke.
Hand-picked from recent projects across Hampshire. Same approach, different gardens.






How we build it
The detail, in plain numbers.
Joists
C24 treated, 400mm centres or tighter per board
Ventilation
150mm clearance, perimeter airflow detailed
Fixings
Stainless or galvanised; hidden where visible
Lighting
12V recessed LED on optional sub-circuit
BudgetMost decks sit between £5,000 and £18,000 depending on size, material and complexity.
TimingTypical book-in is four to six weeks; build one to three weeks on site.
Common questions
What Basingstoke clients usually ask about decking.
How long does a decking project take?+
Most decks run one to two weeks on site. Raised platforms with retaining or integrated lighting can stretch to three.
Will the deck last on damp ground?+
Yes - when the sub-frame is detailed for it. We lift the deck off the ground on adjustable supports, ventilate the perimeter and use ground-suitable joist material. Most failures we're called to fix come from sub-frames that weren't.
Can you build over an existing patio or concrete?+
Often, yes - adjustable supports let us level a new deck over old paving without a full break-out. We assess the slab condition first.
Do you handle balustrades, steps and integrated planters?+
Yes. All built into the same sub-frame, finished in matching timber or composite. We prefer to design the whole platform as one piece rather than bolting extras on later.
Other work in Basingstoke
Same team, different parts of the garden.
Nearby
Decking in nearby areas.
Basingstoke · Hampshire
Talk to us about decking in Basingstoke.
A short WhatsApp with a photo or two is the easiest way to start. Same-day reply, often within the hour.


