Scott's Garden & Landscaping
A recent decking project near Frimley

Decking · Frimley, Surrey

Decking that suit Frimley gardens.

Decking planned with the house in mind, built by the same team from first visit to final clean-down. Locally based, 10+ years across Surrey, Berkshire, Hampshire.

Workshop in GU15 - close to Frimley

Same team on site every day

10+ years across Surrey, Berkshire, Hampshire

Typical book-in is four to six weeks; build one to three weeks on site.

What we mean by decking

The bit beneath the surface.

Decking lives or dies on the sub-frame. Most failed decks didn't fail on the surface - they failed on joist spacings, bearer support and ventilation that were quietly cut to save a day.

Sub-frames built to spec

Joists at the right centres for the board, bearers supported off independent posts where the ground demands it, full ventilation beneath every panel.

Material chosen for use

Hardwood for warmth and grain, composite for low maintenance and stability - each with trade-offs we'll explain rather than gloss over.

Detailed properly

Hidden fixings where the deck will be looked at; recessed LED runs laid in at sub-frame stage; integrated planters and step nosings finished cleanly.

Why this works in Frimley

Locally tuned, not location-swapped.

When we quote for decking in Frimley, the first visit isn't about specs. It's about how you actually use the back of the house, where the sun is, and where the water goes in November.

We're on a Frimley or Camberley site almost every week - so a Frimley enquiry is usually one of the quickest first visits we book in.

Recent decking

A few from in and around Frimley.

Hand-picked from recent projects across Surrey. Same approach, different gardens.

Decking project near Frimley 1
Decking project near Frimley 2
Decking project near Frimley 3
Decking project near Frimley 4
Decking project near Frimley 5
Decking project near Frimley 6

How we build it

The detail, in plain numbers.

Joists

C24 treated, 400mm centres or tighter per board

Ventilation

150mm clearance, perimeter airflow detailed

Fixings

Stainless or galvanised; hidden where visible

Lighting

12V recessed LED on optional sub-circuit

BudgetMost decks sit between £5,000 and £18,000 depending on size, material and complexity.

TimingTypical book-in is four to six weeks; build one to three weeks on site.

Common questions

What Frimley clients usually ask about decking.

Hardwood or composite - what do you usually recommend?+

Depends on use. Hardwood (iroko, balau) is warmer, more characterful and rewards a bit of seasonal oiling. Composite is virtually maintenance-free and dimensionally stable but gets warmer in direct sun. We'll talk through both against the aspect and your appetite for upkeep.

Will composite get hot in summer?+

More than hardwood - particularly darker colours in full sun. We advise on board colour and the deck's aspect during design to minimise it.

How long does a decking project take?+

Most decks run one to two weeks on site. Raised platforms with retaining or integrated lighting can stretch to three.

Will the deck last on damp ground?+

Yes - when the sub-frame is detailed for it. We lift the deck off the ground on adjustable supports, ventilate the perimeter and use ground-suitable joist material. Most failures we're called to fix come from sub-frames that weren't.

Nearby

Decking in nearby areas.

Frimley · Surrey

Discuss a decking for your Frimley home.

A short WhatsApp with a photo or two is the easiest way to start. Same-day reply, often within the hour.

WhatsApp