
Decking · Frimley, Surrey
Decking that suit Frimley gardens.
Decking planned with the house in mind, built by the same team from first visit to final clean-down. Locally based, 10+ years across Surrey, Berkshire, Hampshire.
Workshop in GU15 - close to Frimley
Same team on site every day
10+ years across Surrey, Berkshire, Hampshire
Typical book-in is four to six weeks; build one to three weeks on site.
What we mean by decking
The bit beneath the surface.
Decking lives or dies on the sub-frame. Most failed decks didn't fail on the surface - they failed on joist spacings, bearer support and ventilation that were quietly cut to save a day.
Sub-frames built to spec
Joists at the right centres for the board, bearers supported off independent posts where the ground demands it, full ventilation beneath every panel.
Material chosen for use
Hardwood for warmth and grain, composite for low maintenance and stability - each with trade-offs we'll explain rather than gloss over.
Detailed properly
Hidden fixings where the deck will be looked at; recessed LED runs laid in at sub-frame stage; integrated planters and step nosings finished cleanly.
Why this works in Frimley
Locally tuned, not location-swapped.
When we quote for decking in Frimley, the first visit isn't about specs. It's about how you actually use the back of the house, where the sun is, and where the water goes in November.
We're on a Frimley or Camberley site almost every week - so a Frimley enquiry is usually one of the quickest first visits we book in.
Recent decking
A few from in and around Frimley.
Hand-picked from recent projects across Surrey. Same approach, different gardens.






How we build it
The detail, in plain numbers.
Joists
C24 treated, 400mm centres or tighter per board
Ventilation
150mm clearance, perimeter airflow detailed
Fixings
Stainless or galvanised; hidden where visible
Lighting
12V recessed LED on optional sub-circuit
BudgetMost decks sit between £5,000 and £18,000 depending on size, material and complexity.
TimingTypical book-in is four to six weeks; build one to three weeks on site.
Common questions
What Frimley clients usually ask about decking.
Hardwood or composite - what do you usually recommend?+
Depends on use. Hardwood (iroko, balau) is warmer, more characterful and rewards a bit of seasonal oiling. Composite is virtually maintenance-free and dimensionally stable but gets warmer in direct sun. We'll talk through both against the aspect and your appetite for upkeep.
Will composite get hot in summer?+
More than hardwood - particularly darker colours in full sun. We advise on board colour and the deck's aspect during design to minimise it.
How long does a decking project take?+
Most decks run one to two weeks on site. Raised platforms with retaining or integrated lighting can stretch to three.
Will the deck last on damp ground?+
Yes - when the sub-frame is detailed for it. We lift the deck off the ground on adjustable supports, ventilate the perimeter and use ground-suitable joist material. Most failures we're called to fix come from sub-frames that weren't.
Other work in Frimley
Same team, different parts of the garden.
Nearby
Decking in nearby areas.
Frimley · Surrey
Discuss a decking for your Frimley home.
A short WhatsApp with a photo or two is the easiest way to start. Same-day reply, often within the hour.



